COMPLETED PROJECTS
Samota Constructions Co. LTD (SAMOTA LTD) has always been trying to provide the best service in terms of civil works, building constructions and all jobs related to building and civil engineering. We are always on the move. Once the project is completed, we start another new project. We are capable of doing 5 or more road works simultaneously. This is possible because of our brand, well maintained equipment, operated by committed employees, and supervised by well qualified engineers and mechanics. We serve all regions of Tanzania in various earth movement and civil projects.
Below are some of the projects which have been completed or on-going:
MINING PROJECTS
· Ore hauling from pit to the ROM pad at the Golden Pride Mine, Nzega, Tabora.
· Covering of Tailings Storage Facilities with waste rocks and top soil materials.
· Supplying granite rocks and construction of surface runoff management structures for modified final landforms (waste rocks damps, TSF, and other structures).
· Final landform construction at the Golden Pride Mine site.
CIVIL WORKS
Below are some of the projects which have been completed or on-going:
MINING PROJECTS
· Ore hauling from pit to the ROM pad at the Golden Pride Mine, Nzega, Tabora.
· Covering of Tailings Storage Facilities with waste rocks and top soil materials.
· Supplying granite rocks and construction of surface runoff management structures for modified final landforms (waste rocks damps, TSF, and other structures).
· Final landform construction at the Golden Pride Mine site.
CIVIL WORKS
- Rehabilitation works along Rungwa – Itigi – Mkiwa Trunk Road.
- Bridge Preventive Maintenance along Rungwa – Itigi – Mkiwa Trunk Road.
- Routine Maintenance Works along Rungwa – Mbeya – Singida Border.
- Routine and Recurrent Maintenance Works along Ikungi – Londoni – Kilimatinde (Solya)Regional Road.
- Rehabilitation Works along Soweto (Kiomboi) Kisirisiri - Chemchem Regional Road.
- Routine and Recurrent Maintenance Works along Manyoni East – Heka – Sanza – Chaligongo.
- Routine and Recurrent Maintenance Works along Sabasaba – Sepuka Regional Road.
- Periodic Maintenance Works along Tabora – Ulyankulu unpaved Regional Road (Urban Section) and Kasu – Airport paved Regional Road.
- Bridge Major Repair of Manonga Bridge ( Construction of Box Culverts and Approach Roads) along Manonga – Igurubi unpaved Regional Road (I Package).
- Periodic maintenance and Spot Improvement works along Puge – Ziba Regional road in Tabora Region.
- Routine and Recurrent, Periodic and Spot Improvement works along Koga – Ipole Unpaved Trunk Road.
- Periodic maintenance and Spot Improvement works along Ugalla – Kaliua – Ulyankulu – Ng’wande Unpaved Regional roads.
- Periodic maintenance and Spot Improvement works along Buyange (MZA/SHY BRD) Busoke and Masabi-Mega unpaved Regional Road in Shinyanga Region.
- Periodic maintenance and Spot Improvement works along Mishamo-Msobwe Katavi/Kigoma Trunk Road, T.009.
- Routine and Recurrent maintenance works. Spot Improvement & Bridge Preventive Works along Kolandoto-Mwangongo unpaved Trunk Road.
- Routine and Recurrent maintenance Bridges Preventive Maintanance along Mpanda-Koga (Katavi/TBR Border) Trunk Road, T.023.
- Maintenance and Spot Improvement Works along Sikonge-Mibono-Kipili unpaved Regional Road.